Light Control Film
“LC MAGIC”
Installation image
Wiring image diagram
The red lined items are the range for customers to prepare.
LC MAGIC requires 2 steps for installing.
1. Film attachment (on-site / factory)
2. Electrical construction (power supply, switch, wiring)
* Film installation can be provided for domestic customers.
Precautions for installation
There are restrictions for installation in the following locations.
Please contact from the inquiry form for details.
-

Glass less than
5mm thick -

Wet areas
Places where condensation occurs -

Window with
outside light -

Movable doors
-

Curved surface
